Cavalry Contracting Inc. completed this 70′ X 150′ riding arena in the summer of 2022. This building had 10′ I beam legs installed on a concrete sono tube foundation. During installation of the foundation, water seeping into drilled holes at about 3′ depth due to low lying area of the build was dealt with by engaging engineers to design a larger foundation to deal with the water. Installation continued and together with the exterior finishes such as single and double Dutch doors, 16′ X 16′ steel overhead door, end and side walls in metal cladding; this riding arena was complete with an aesthetically pleasing look.