3rd party Engineering was retained to verify the integrity of the building prior to the new construction.
Scope of Work;
- Supply and installation of 1 – ½’’ Z-bar strapped horizontally 48’’ OC around building
- Supply and install 1-1/2” Rigid Insulation (5120 sq/ft)
- Supply and installation of 26Ga. Metal siding, which will run vertically (5,200sq.ft); standard colour and standard paint finish
- Supply and installation of 26Ga. Metal flashings including ridge cap
What a great new look to an older building, increasing it’s energy efficiency with new insulation under the metal cladding. Great job Cavalry crew!!