Garden Centre Equipment Storage Building

Home / Project / Garden Centre Equipment Storage Building
ABOUT PROJECT

Summer 2014 Cavalry Contracting was hired to build a 30’ x 60’ Atlas 18 Britespan Building System

PROJECT GALLERY
PROJECT DESCRIPTION
  • Project Type Fabric Structure
  • Industry Type Commercial
  • Location Caledon, Ontario
  • Square ft 1800 sq/ft.
  • Length 60 ft.
  • Width 30 ft.
  • Duration 2 weeks

  • - Auger and set post foundation
    - Assemble and erect trusses
    - Pull cover and tie down structure
    - Strap and enclose gable ends in metal siding

Related

PROJECTS